欢迎您访问南京赢咖7娱乐有限公司网站!
点击拨打服务热线:400--555-666
大家都在搜: 铲斗外翻 3.5吨A后侧 3.5吨A后尾

造成混凝土赢咖7注册重载运转的五大原因?

来源:http://www.yuanmei168.com/日期:2021-01-15

概述:重负荷运行的原因是什么?希望以下五个命题能对赢咖7注册的操作和使用有所帮助:What are the reasons for heavy load operation? It
重负荷运行的原因是什么?希望以下五个命题能对赢咖7注册的操作和使用有所帮助:
What are the reasons for heavy load operation? It is hoped that the following five propositions can be helpful to the operation and use of concrete mixer:
1.混凝土赢咖7注册根据所需的混凝土配比确定供水量,并将时间计数器调整到相应的供水时间;
1. The concrete mixer determines the water supply according to the required concrete ratio, and adjusts the time counter to the corresponding water supply time;
2.混凝土赢咖7注册启动混凝土赢咖7注册搅拌电机运行
2. The concrete mixer starts the mixing motor of the concrete mixer
3.混凝土赢咖7注册关闭卸料门,将所需的混合料加入料斗,并提升料斗。稳定土搅拌站料斗应运行平稳,停在轨道的任意位置。
3. Close the discharge door of the concrete mixer, add the required mixture into the hopper, and lift the hopper. The hopper of stabilized soil mixing plant should run smoothly and stop at any position of the track.
             混凝土赢咖7注册
如有打滑,应先将料斗放在坑底,然后调整制动电机的大螺母。料斗提升正常,制动可靠后,将物料送入搅拌筒,启动水泵向搅拌筒供水。搅拌25-35秒后,卸料门开始卸料;
In case of slippage, the hopper should be placed at the bottom of the pit, then the large nut of the brake motor should be adjusted. After the hopper lifting is normal and the brake is reliable, the material is sent to the mixing drum, and the water pump is started to supply water to the mixing drum. After mixing for 25-35 seconds, the discharge gate starts to discharge;
4.在上述试运过程中,混凝土赢咖7注册如发现异常情况,应立即停机检查并排除故障,然后重新进行试验,直正常停机。新混凝土赢咖7注册运行后,检查并拧紧衬板及其他部位的所有螺栓和螺母。变速器的光滑部分涂上了光滑的油。
4. In the process of the above test run, if any abnormality is found in the concrete mixer, it should be stopped immediately to check and remove the fault, and then the test should be conducted again until the normal stop. After a day's operation of the new concrete mixer, check and tighten all bolts and nuts on the lining plate and other parts. The smooth part of the transmission is coated with smooth oil.
以上是形成混凝土赢咖7注册重载运行的五大原因的全部内容,希望对大家有所帮助,如想了解更多精彩内容请多多关注我们的网站。
The above is the formation of concrete mixer heavy load operation of all the five reasons, I hope to help you, if you want to know more wonderful content, please pay more attention to our website.

截屏,微信识别二维码