自动搅拌一体机如何重载试运转?
来源:http://www.yuanmei168.com/日期:2021-05-31
搅拌一体机在进行运输重载混凝土的时候会进行试运转,那么你知道它是如何进行试运转的吗?下面为大家介绍一下步骤。
The all-in-one mixer will be put into trial operation when transporting heavy-duty concrete. Do you know how it is put into trial operation? Here are the steps.
1、按所需混凝土配比确定供水量,并调节时间继电器到相应的给水时间。
1. Determine the water supply according to the required concrete ratio, and adjust the time relay to the corresponding water supply time.
2、启动搅拌电动机运转。
2. Start the mixing motor.
3、关闭卸料门,在料斗内加入所需的混合料后,提升料斗,料斗应运行平稳并能自如停止在轨道的任意位置,若有打滑现象,应先将料斗放入坑底,然后调整制动电机上的大螺母。料斗提升正常,制动可靠后,向搅拌罐内投料,同时启动水泵向搅拌罐内供水。
3. Close the discharge door and add the required mixture into the hopper. After lifting the hopper, the hopper should run smoothly and stop at any position of the track freely. If there is slippage, the hopper should first be put into the bottom of the pit and then adjust the large nut on the brake motor. After the hopper lifting is normal and the brake is reliable, the material is fed into the mixing tank, and the water pump is started to supply water to the mixing tank.
4、搅拌25—35秒后,启动卸料门卸料。
4. After mixing for 25-35 seconds, start the discharge valve to discharge.
5、在上述各项试运转过程中,如发现不正常情况,应立即停机检查,排除故障,然后再次试验,直到正常为止。
5. In the process of the above test run, if any abnormality is found, stop the machine immediately for inspection, remove the fault, and then test again until it is normal.
搅拌一体机的重载试运转就是上面介绍的这个样子,车辆在重载时进行试运转是非常有必要的,司机师傅们一定要注意了。
The heavy load test run of the mixer is just like the above. It is very necessary to test run the vehicle when it is heavy load. Drivers must pay attention to it.
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: mixing machine http://www.yuanmei168.com .