混凝土赢咖7注册的维护保养靠日常
来源:http://www.yuanmei168.com/日期:2022-09-17
混凝土赢咖7注册包括通过轴与传动机构连接的动力机构及由传动机构带动的滚筒,在滚筒筒体上装围绕滚筒筒体设置的齿圈,传动轴上设置与齿圈啮合的齿轮。那么您知道怎么维护保养它吗?
The concrete mixer consists of a power mechanism connected with a transmission mechanism through a shaft and a drum driven by a transmission mechanism. A gear ring arranged around the drum body is arranged on the drum body, and a gear engaged with the gear ring is arranged on the transmission shaft. Do you know how to maintain it?
1、保养机体的清洁,机体上的污物和障碍物。
1. Maintain the cleanness of the body and remove dirt and obstacles on the body.
2、检查各润滑处的油料及电路和控制设备,并按要求加注润滑油。
2. Check the oil, circuit and control equipment at each lubrication point, and add lubricating oil as required.
3、每班工作前,在搅拌筒内加水空转1--到2min,同时检查离合器和制动装置工作的可靠性。
3. Before each shift, add water into the mixing drum and idle for 1 - to 2min, and check the reliability of the clutch and brake device.
4、混凝土赢咖7注册运转过程中,应随时检听电动机,减速器,传动齿轮的噪声是否正常,温升是否过高,
4. During the operation of the concrete mixer, check whether the noise of the motor, reducer and transmission gear is normal, and whether the temperature rise is too high,
5、每班工作结束后,应认真清洗混凝土赢咖7注册。
5. After each shift, the concrete mixer shall be carefully cleaned.
此外在减速电机中,装有合成齿轮油,其数量须根据铭牌要求严格控制,如果油量较多或较少,均会对电动滚筒实际运转造成不良影响。
In addition, the reducer motor is equipped with synthetic gear oil, and its quantity must be strictly controlled according to the nameplate requirements. If the oil quantity is more or less, it will have a negative impact on the actual operation of the electric drum.
在电动滚筒累计运转时间超过200-300h后,应进行更换,之后每500h更换一次合成齿轮油,在换油的过程中,两个油塞须同时旋开,同时对滚筒进行旋转,保证其处在低的位置,直到电机中的油放空为止。
After the accumulated running time of the electric roller exceeds 200-300h, it shall be replaced. After that, the synthetic gear oil shall be replaced every 500h. During the oil change process, the two oil plugs must be unscrewed at the same time, and the roller shall be rotated to ensure that it is in the low position until the oil in the motor is drained.
按照要求对滚筒轴承室中加注润滑脂,同时还要在丝杠的表面均匀涂抹一层润滑脂。各台班结束后,须对滚筒表面、胶带底面和托辊上的杂物进行清理,防止杂物对设备正常运行造成不良影响。
Fill the roller bearing chamber with lubricating grease as required, and at the same time, evenly apply a layer of lubricating grease on the surface of the lead screw. At the end of each shift, the sundries on the drum surface, the bottom of the tape and the idler must be cleaned to prevent the sundries from adversely affecting the normal operation of the equipment.
The maintenance of the concrete mixer depends on the daily related content. If you have any questions about it, you can come to our website at any time http://www.yuanmei168.com Consult.