搅拌一体机运用过程中需要留意的事项
来源:http://www.yuanmei168.com/日期:2022-09-28
搅拌一体机在运用过程中,咱们要作业,要清楚了解拌和车在运用操作过程中应当留意哪些事项,下面小编为您解析需求留意的事项:
During the operation of the mixer, we should work safely, and clearly understand what should be paid attention to during the operation of the mixer. The following is a summary of what you need to pay attention to:
一、发动前应对机械系统各部位仔细进行查看,承认状况正常后才能够发动。
1、 Before starting, each part of the mechanical system shall be carefully checked, and it can only be started after it is acknowledged that the condition is normal.
二、发动前,拌和操纵杆有必要放在“空档”方位。
2、 Before starting, it is necessary to place the mixing control lever in the "neutral" position.
三、发动后,应将拌和操纵杆放在“卸料”方位,放去筒内积水。
3、 After starting, place the mixing control lever at the "unloading" position to drain the accumulated water in the cylinder.
四、装料时,拌和操作杆应当放在“装料”方位。
4、 When loading, the mixing operating rod shall be placed in the "loading" position.
五、运送前,卸料槽有必要固定在“跋涉”方位,避免摇摆。
5、 Before transportation, it is necessary to fix the discharge chute at the "trek" position to avoid swinging.
六、操作操纵杆时,应在“空档”方位稍作逗留后方可动下一个方位。
6、 When operating the control lever, stay in the "neutral" position for a while before moving to the next position.
七、咱们要做好文明施工,桶内多余材料不能随意乱倒。卸料后有必要对拌和筒、料槽、托辊等部位进行清洗。
7、 We should do a good job in civilized construction. Excess materials in barrels should not be dumped randomly. After unloading, it is necessary to clean the mixing drum, material trough, idler and other parts.
八、人进入筒内铲除砼结块时,应将车辆熄火,拔下电门钥匙,筒外应当有人进行监护。
8、 When people enter the cylinder to remove concrete caking, they should turn off the vehicle, pull out the switch key, and someone should be outside the cylinder for monitoring.
此外由于混凝土会在短时间内凝结成硬块,且对钢材和油漆有一定的腐蚀性,所以每次运用混凝土贮罐后,洗净粘附在混凝土贮罐及进出料口上的混凝土是每日维护有必要细心进行的工作。其间包括:
In addition, since the concrete will be condensed into hard blocks in a short time, and has a certain corrosivity to steel and paint, it is necessary to carefully clean the concrete adhered to the concrete storage tank and the inlet and outlet after each use of the concrete storage tank. This includes:
a.每次装料前用水冲刷进料口,使进料口在装料时坚持湿润;
a. Before each loading, flush the feed inlet with water to keep it wet during loading;
b.在装料的一同向随车自带的清洗用水水箱中注满水;
b. Fill the water tank for cleaning water with the vehicle at the same time of loading;
c.装料后冲刷进料口,洗净进料口附近残留的混凝土;
c. After loading, flush the feed inlet and clean the residual concrete near the feed inlet;
d.到工地卸料后,冲刷出料槽,然后向混凝土贮罐内加清洗用水30—40L;在车辆回程时坚持混凝土贮罐正向慢速滚动;
d. After unloading at the construction site, flush the discharge chute, and then add 30-40L of cleaning water to the concrete storage tank; Keep the concrete tank rolling slowly in the forward direction when the vehicle returns;
e.下次装料前紧记放掉混凝土贮罐内的污水;
e. Remember to drain the sewage in the concrete storage tank before the next loading;
In addition, at the end of each day, the concrete storage tank and the area around the inlet and outlet shall be cleaned to ensure that there is no cement or concrete caking. If the above work is not carried out carefully once, it will bring great trouble to the future work. More relevant notes will come to our website http://www.yuanmei168.com Consult!